Senior Safety Engineer - Data Center Construction at Fa Esgu Saasfaprod1, Omaha, NE
Senior Safety Engineer - Data Center Construction at Fa Esgu Saasfaprod1 in Omaha, NE. Contract. $89,500 a year. Apply with swipeandhired.
Mortenson is currently seeking a Senior Safety Engineer that will be responsible for implementing Mortenson’s Zero Injury Safety program across multiple project sites and ensuring a safe work environment for team members, subcontractors, and visitors to the construction work site.
This position offers opportunities at both levels 1 and 2, allowing candidates to apply based on their experience and qualifications. Compensation for this role is determined based on factors such as experience and location.
Accepted Locations: Omaha, NE & Lincoln, NE
RESPONSIBILITIES
- Implement and administer safety programs at worksites, including site-specific safety activities and training programs
- Document and track safety violations, conduct safety audits, and analyze loss control data
- Lead OSHA reporting, monitor subcontractor activities, and review safety submittals
- Record, monitor, and analyze safety, injury, and hazard statistics
- Provide safety-related information, evaluate industrial hygiene concerns, and maintain knowledge of safety standards
- Serve as a resource for safety issues, attend safety meetings, and assist with major incident analysis
- Work with client safety personnel, union representatives, and insurance risk engineers
- Ensure maintenance and inspection of safety equipment and build relationships with diverse backgrounds and organizational levels
QUALIFICATIONS
- Bachelor’s degree in safety, occupational health, or equivalent;
OR
- High school diploma with CHST Certification, OSHA 500, and a minimum of 10 years construction experience leading crews and planning work, to include at least six years as a dedicated construction safety professional responsible for managing project safety programs, conducting / reviewing hazard analyses and developing controls, conducting safety training, and planning work activities or equivalent experience in a relevant field
- Minimum of four years of construction safety experience
- Current valid driver’s license
- Detail-oriented with the ability to organize and manage multiple project tasks
- Proficiency in Microsoft Office and relevant safety software programs
- Positive and professional attitude with strong customer service skills
- Ability to interpret and communicate Mortenson policies effectively
- Willingness to travel up to 100%
A few benefits offered include:
(for Non-Craft & Non-Union Craft working 25+ hours / week)
- Medical and prescription drug plans that includes no additional cost vision coverage
- Dental plan
- 401k retirement plan with a generous Mortenson match
- Paid time off, holidays, and other paid leaves
- Employer paid Life, AD&D, and disability insurance
- No-Cost mental health tool and concierge with extensive work-life resources
- Tuition reimbursement
- Adoption Assistance
- Gym Membership Discount Program
Senior Safety Engineer I:
MINIMUM QUALIFICATIONS: See Above
The base pay range for this role is $89,500 MIN - $120,800 MAX. (Actual range is higher for the following office locations: Denver, CO and Chicago, IL – 5%, Seattle, WA, and Portland, OR – 10%, Washington, D.C. – 12.5%).
Senior Safety Engineer II:
MINIMUM QUALIFICATIONS: 10 years construction experience leading crews and planning work, including six years as a dedicated construction safety professional training, and planning work activities or equivalent experience in a relevant field
Mini